Freestanding Rack System

Designed, built and installed a free standing boat rack system with capacity for 14 boats weighing 15,000 lbs each.

Marina Metal Building Roof Replacement

Replaced a roof over a marina metal building that had reached the end of its useful life.    Removed all the old roof panels, repaired/replaced wasted secondary components, and installed all new roof panels with a 5 year leak guarantee.

35′ Damaged Column

We were tasked to remove a 35′ high damaged column from an existing building that had been hit by a car. We replaced the column and installed new panels to restore the building to its original construction.