We recently completed project for a marina in Florida. The Marina had sustained extensive structural damage from a major hurricane and management placed their trust in Kimberly Steel to evaluate the damage with their engineers to determine the scope of repairs. A plan was developed and executed by Kimberly Steel to bring the storage barn back to 100% operational capability.
A summary of the workscope
Remove all metal panels from ends of the buildings and roof.
Replace all damaged building columns, supports, and boat racks with new galvanized steel
members
Install new secondary building components to replace damaged and all new metal panels
Remove and replace roof with upgraded panels, insulation and skylights.